z-logo
open-access-imgOpen Access
Implementasi Prinsip Ekonomi Gerakan Untuk Pengaturan Tata Letak Fasilitas Kerja Pada Pemrosesan Batu Alam
Author(s) -
Luciana Triani Dewi,
Marta Hayu Raras Sita Rukmika Sari,
Chandra Dewi,
Vincensius Ariyono
Publication year - 2015
Publication title -
performa
Language(s) - English
Resource type - Journals
eISSN - 2620-6412
pISSN - 1412-8624
DOI - 10.20961/performa.14.2.11488
Subject(s) - span (engineering) , work (physics) , engineering , mechanical engineering , civil engineering
The layout and arrangement of production facilities is one key to productive and efficient working  environment. In planning and setting the layout of the factory, one of the basic principles that should be  considered is the planning of work stations. Every operation must be designed in detail by applying  economic principles in the movement of goods to and from work station. The study was conducted in a  small industry which manufactures natural stone craft in Yogyakarta. Development of work stations  design remains to reduce unnecessary activities such as searching and moving equipment activity.  Economic principles applied in the development of a facility layout. Evaluation of the layout design was  used time study analysis based on the two hand chart before and after improvement of work station  layout. Implementation of improved design showed improvement working time for the process which  increasing efficiency up to 31.51%. Reduction standard time is achieved because the work methods  becomes easier and faster than before.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here