
APPLICATION OF AUTOMATIC PHASE SHUNTING FOR SUPPRESSION OF THE SECONDARY ARC IN PAUSE PAIRS OF EXTRA HIGH VOLTAGE TRANSMISSION LINES
Author(s) -
V.V. Kuchanskyi
Publication year - 2019
Publication title -
energetika. ekonomìka, tehnologìï, ekologìâ
Language(s) - English
Resource type - Journals
eISSN - 2308-7382
pISSN - 1813-5420
DOI - 10.20535/1813-5420.1.2019.182478
Subject(s) - overvoltage , electrical engineering , arc (geometry) , engineering , voltage , shunting , power factor , three phase , power (physics) , arc fault circuit interrupter , transmission line , electric power transmission , ac power , phase (matter) , aperiodic graph , electronic engineering , short circuit , mechanical engineering , physics , mathematics , medicine , quantum mechanics , combinatorics