z-logo
open-access-imgOpen Access
Cloud model-based evaluation of landslide dam development feasibility
Author(s) -
Dengze Luo,
Hongtao Li,
Yu Hui Wu,
Dong Liu,
Xianrui Yang,
Qiang Yao
Publication year - 2021
Publication title -
plos one
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.99
H-Index - 332
ISSN - 1932-6203
DOI - 10.1371/journal.pone.0251212
Subject(s) - landslide , analytic hierarchy process , cloud computing , randomness , computer science , process (computing) , environmental science , data mining , civil engineering , operations research , geology , geotechnical engineering , engineering , statistics , mathematics , operating system
As natural backwater structures, landslide dams both threaten downstream human settlement or infrastructure and contain abundant hydro-energy and tourism resources, so research on their development feasibility is of great significance for permanently remedying them and effectively turning disasters into benefits. Through an analysis of the factors influencing landslide dam development and utilization, an index system (consisting of target, rule, and index layers) for evaluating development feasibility was constructed in this paper. Considering uncertainty and randomness in development feasibility evaluation, a cloud model-improved evaluation method was proposed to determine membership and score clouds based on the uncertainty reasoning of cloud model, and a cloud model-improved analytic hierarchy process (AHP-Cloud Model) was introduced to obtain weights. Final evaluation results were obtained using a hierarchical weighted summary. The improved method was applied to evaluate the Hongshiyan and Tangjiashan landslide dams and the results were compared with the maximum membership principle results. The results showed that the cloud model depicted the fuzziness and uncertainty in the evaluation process. The improved method proposed in this paper overcame the loss of fuzziness in the maximum membership principle evaluation results, and was capable of more directly presenting evaluation results. The development feasibility of the Hongshiyan landslide dam was relatively high, while that of the Tangjiashan landslide dam was relatively low. As suggested by these results, the evaluation model proposed in this paper has great significance for preparing a long-term management scheme for landslide dams.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here