Inventory-transportation integrated optimization for maintenance spare parts of high-speed trains
Author(s) -
Boliang Lin,
Jiaxi Wang,
Huasheng Wang,
Zhongkai Wang,
Jian Li,
Ruixi Lin,
Jie Xiao,
Jianping Wu
Publication year - 2017
Publication title -
plos one
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.99
H-Index - 332
ISSN - 1932-6203
DOI - 10.1371/journal.pone.0176961
Subject(s) - spare part , train , economic shortage , revenue , operations research , computer science , transport engineering , operations management , engineering , business , linguistics , philosophy , cartography , accounting , government (linguistics) , geography
This paper presents a 0–1 programming model aimed at obtaining the optimal inventory policy and transportation mode for maintenance spare parts of high-speed trains. To obtain the model parameters for occasionally-replaced spare parts, a demand estimation method based on the maintenance strategies of China’s high-speed railway system is proposed. In addition, we analyse the shortage time using PERT, and then calculate the unit time shortage cost from the viewpoint of train operation revenue. Finally, a real-world case study from Shanghai Depot is conducted to demonstrate our method. Computational results offer an effective and efficient decision support for inventory managers.
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom