z-logo
open-access-imgOpen Access
Methodologies for Pre-Validation of Biofilters and Wetlands for Stormwater Treatment
Author(s) -
Kefeng Zhang,
Anja Ranđelović,
Larissa Melanie Aguiar,
Declan Page,
David Thomas McCarthy,
Ana Deletić
Publication year - 2015
Publication title -
plos one
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.99
H-Index - 332
ISSN - 1932-6203
DOI - 10.1371/journal.pone.0125979
Subject(s) - stormwater , environmental science , impervious surface , percentile , wetland , hydrology (agriculture) , combined sewer , environmental engineering , surface runoff , ecology , engineering , statistics , mathematics , geotechnical engineering , biology
Background Water Sensitive Urban Design (WSUD) systems are frequently used as part of a stormwater harvesting treatment trains (e.g. biofilters (bio-retentions and rain-gardens) and wetlands). However, validation frameworks for such systems do not exist, limiting their adoption for end-uses such as drinking water. The first stage in the validation framework is pre-validation, which prepares information for further validation monitoring. Objectives A pre-validation roadmap, consisting of five steps, is suggested in this paper. Detailed methods for investigating target micropollutants in stormwater, and determining challenge conditions for biofilters and wetlands, are provided. Methods A literature review was undertaken to identify and quantify micropollutants in stormwater. MUSIC V5.1 was utilized to simulate the behaviour of the systems based on 30-year rainfall data in three distinct climate zones; outputs were evaluated to identify the threshold of operational variables, including length of dry periods (LDPs) and volume of water treated per event. Results The paper highlights that a number of micropollutants were found in stormwater at levels above various worldwide drinking water guidelines (eight pesticides, benzene, benzo(a)pyrene, pentachlorophenol, di-(2-ethylhexyl)-phthalate and a total of polychlorinated biphenyls). The 95 th percentile LDPs was exponentially related to system design area while the 5 th percentile length of dry periods remained within short durations (i.e. 2–8 hours). 95 th percentile volume of water treated per event was exponentially related to system design area as a percentage of an impervious catchment area. Conclusions The out-comings of this study show that pre-validation could be completed through a roadmap consisting of a series of steps; this will help in the validation of stormwater treatment systems.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here