z-logo
open-access-imgOpen Access
INCREASING THE PROTECTION EFFICIENCY OF 0.4 KV POWER TRANSMISSION LINES WITH BRANCH LINES FROM SINGLE-PHASE SHORT CIRCUITS DUE TO THE USE OF MULTI-CONTACT SWITCHING SYSTEM MSS-2-3
Author(s) -
Aleksandr V Vinogradov,
Алина Виноградова,
Aleksandr Psarev,
Alexander Alexandrovich Lansberg,
Vadim Bolshev
Publication year - 2020
Publication title -
vestnik kazanskogo gosudarstvennogo agrarnogo universiteta
Language(s) - English
Resource type - Journals
ISSN - 2073-0462
DOI - 10.12737/2073-0462-2020-58-63
Subject(s) - electric power transmission , installation , electrical engineering , power (physics) , line (geometry) , transmission line , electronic circuit , engineering , power transmission , electronic engineering , computer science , physics , mechanical engineering , mathematics , geometry , quantum mechanics
The purpose of the work is to increase the protection efficiency of 0.4 kV power lines with branch lines from single-phase short circuits by means of using the multi-contact switching system MSS-2-3. It can be not possible to provide the necessary sensitivity of protecting 0.4 kV power lines against one-phase short circuits when the power line length is too high and when the wire cross section does not provide the necessary value of the phase-zero loop resistance. Power line sectionalizing helps to solve this problem. It allows dividing power lines into sections, each is protected by its protective device. The settings of the protective devices installed at the beginning of a power transmission line and at the sectioning units (SU) are different. It provides the necessary selectivity of their work. At the same time, many power transmission lines (PTL) have long branch lines. The choice of the installation site of SU in such lines is difficult since a short circuit or other damage can occur both on a trunk line section and on a branch line. When installing SU both before a branch line and behind it, there might be the cases of unjustified power supply outages. Therefore, it is necessary to develop devices allowing for sectionalizing such power lines at the installation site of SU while ensuring the possibility of disconnecting both a trunk line section and a branch line directly. Such a device is a multi-contact switching system having two independent contact groups and three outputs (MSS-2-3). Installing the MSS-2-3 at a branch line point increases the security of the power transmission line against short circuits including single-phase ones and also increases power supply reliability to consumers since only a damaged section is disconnected in case of damage to the power transmission line. The feature of choosing the settings for the operation of switching devices installed in the MKS-2-3 to protect the switched power line sections is the need to take into account the parameters of a trunk line section and a branch line

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here