z-logo
open-access-imgOpen Access
Verification of Surface Temperature Forecasts from the National Digital Forecast Database over the Western United States
Author(s) -
David T. Myrick,
John D. Horel
Publication year - 2006
Publication title -
weather and forecasting
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 1.393
H-Index - 106
eISSN - 1520-0434
pISSN - 0882-8156
DOI - 10.1175/waf946.1
Subject(s) - environmental science , data assimilation , climatology , national weather service , meteorology , forecast skill , database , computer science , geography , geology
Experimental gridded forecasts of surface temperature issued by National Weather Service offices in the western United States during the 2003/04 winter season (18 November 2003–29 February 2004) are evaluated relative to surface observations and gridded analyses. The 5-km horizontal resolution gridded forecasts issued at 0000 UTC for forecast lead times at 12-h intervals from 12 to 168 h were obtained from the National Digital Forecast Database (NDFD). Forecast accuracy and skill are determined relative to observations at over 3000 locations archived by MesoWest. Forecast quality is also determined relative to Rapid Update Cycle (RUC) analyses at 20-km resolution that are interpolated to the 5-km NDFD grid as well as objective analyses obtained from the Advanced Regional Prediction System Data Assimilation System that rely upon the MesoWest observations and RUC analyses. For the West as a whole, the experimental temperature forecasts issued at 0000 UTC during the 2003/04 winter season exhibit skill at lead times of 12, 24, 36, and 48 h on the basis of several verification approaches. Subgrid-scale temperature variations and observational and analysis errors undoubtedly contribute some uncertainty regarding these results. Even though the “true” values appropriate to evaluate the forecast values on the NDFD grid are unknown, it is estimated that the root-mean-square errors of the NDFD temperature forecasts are on the order of 3°C at lead times shorter than 48 h and greater than 4°C at lead times longer than 120 h. However, such estimates are derived from only a small fraction of the NDFD grid boxes. Incremental improvements in forecast accuracy as a result of forecaster adjustments to the 0000 UTC temperature grids from 144- to 24-h lead times are estimated to be on the order of 13%.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here