Single-Machine Scheduling Problems with the General Sum-of-Processing-Time and Position-Dependent Effect Function
Author(s) -
K. Shen,
Yuke Chen,
Shang-Chia Liu
Publication year - 2021
Publication title -
discrete dynamics in nature and society
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.264
H-Index - 39
eISSN - 1607-887X
pISSN - 1026-0226
DOI - 10.1155/2021/9236044
Subject(s) - job shop scheduling , monotonic function , function (biology) , position (finance) , scheduling (production processes) , time complexity , mathematics , combinatorics , polynomial , mathematical optimization , single machine scheduling , discrete mathematics , computer science , mathematical analysis , schedule , finance , evolutionary biology , economics , biology , operating system
This paper considers the combination of the general sum-of-processing-time effect and position-dependent effect on a single machine. The actual processing time of a job is defined by functions of the sum of the normal processing times of the jobs processed and its position and control parameter in the sequence. We consider two monotonic effect functions: the nondecreasing function and the nonincreasing function. Our focus is the following objective functions, including the makespan, the sum of the completion time, the sum of the weighted completion time, and the maximum lateness. For the nonincreasing effect function, polynomial algorithm is presented for the makespan problem and the sum of completion time problem, respectively. The latter two objective functions can also be solved in polynomial time if the weight or due date and the normal processing time satisfy some agreeable relations. For the nondecreasing effect function, assume that the given parameter is zero. We also show that the makespan problem can remain polynomially solvable. For the sum of the total completion time problem and a 1 is the deteriorating rate of the jobs, there exists an optimal solution for a 1 ≥ M ; a V-shaped property with respect to the normal processing times is obtained for 0 < a 1 ≤ 1 . Finally, we show that the sum of the weighted completion problem and the maximum lateness problem have polynomial-time solutions for a 1 > M under some agreeable conditions, respectively.
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom