z-logo
Premium
SU‐F‐J‐144: Scatter and Leakage Survey of An Integrated MR‐Linac System
Author(s) -
Wang J,
Bosco G,
Darenbourg B,
Ibbott G
Publication year - 2016
Publication title -
medical physics
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 1.473
H-Index - 180
eISSN - 2473-4209
pISSN - 0094-2405
DOI - 10.1118/1.4956052
Subject(s) - leakage (economics) , linear particle accelerator , beam (structure) , optics , dosimetry , radiation , magnet , materials science , physics , nuclear medicine , medicine , quantum mechanics , economics , macroeconomics
Purpose: To assess the scatter and leakage radiation of an integrated 1.5T MRI‐Linac system. Methods: A 150cc chamber (model 96020C, Inovision) was used in all the scatter and leakage measurements, after being recalibrated for MV energy by the Accredited Dosimetry Calibration Laboratory at MD Anderson. The scatter radiation was measured by placing a 25 cm stack of solid‐water materials at iso‐center on the patient couch to simulate patient scatter. Gantry angles were positioned at 0 degree (beam pointing downward) and 270 (beam pointing laterally). Scatter radiation was measured at selective locations inside the RF room. Beam stopper leakage was measured at the exterior panel of the gantry. The head leakage was measured at 1 meter away from the Linac head in the direction which was determined to be the area of maximum leakage by wrapped films test. All measurements were repeated with the 1.5T magnetic field turned off to study the effect of magnetic field. Results: When the magnet was on (B=1.5T), the maximum head leakage at 1 meter was 191.6mR/1000MU. The scatter radiation at 1 meter from the iso‐center was 1.091R/1000MU when the radiation beam was pointing downward, 1.296R/1000MU when the beam pointed laterally. The beam stopper leakage was measured as 299.4 mR/1000MU at the exterior panel of the gantry. When magnet was off (B=0), the head leakage was measured as 198.6mR/1000MU. The scatter radiation at 1 meter was 1.153R/1000MU when beam pointed downward, 1.287R/1000MU when beam pointed laterally. The beam stopper leakage was measured as 309.4 mR/1000MU at the exterior panel of the gantry. Conclusion: The measurements indicate that the scatter and leakage radiation from the integrated MR‐Linac system are in‐line with the expected values. The beam stopper leakage is approximately 300 mR/1000MU. The leakage and scatter difference with the magnetic field ON and OFF was within 5%. The authors received a corporate sponsored grant from Elekta which is the vendor of the MR‐Linac system studied in this work.

This content is not available in your region!

Continue researching here.

Having issues? You can contact us here