z-logo
Premium
PRODUCTION SCHEDULING OF CONTINUOUS FLOW LINES: MULTIPLE PRODUCTS WITH SETUP TIMES AND COSTS
Author(s) -
CHENG FENG,
YAN HOUMIN,
YANG JUN
Publication year - 1998
Publication title -
production and operations management
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 3.279
H-Index - 110
eISSN - 1937-5956
pISSN - 1059-1478
DOI - 10.1111/j.1937-5956.1998.tb00131.x
Subject(s) - scheduling (production processes) , computer science , variable cost , production schedule , mathematical optimization , production (economics) , schedule , operations research , product (mathematics) , product type , production planning , production rate , holding cost , operations management , industrial engineering , microeconomics , economics , mathematics , geometry , programming language , engineering , operating system
The problem of production planning and setup scheduling of multiple products on a single facility is studied in this paper. The facility can only produce one product at a time. A setup is required when the production switches from one type of product to another. Both setup times and setup costs are considered. The objective is to determine the setup schedule and production rate for each product that minimize the average total costs, which include the inventory, backlog, and setup costs. Under the assumption of a constant production rate, we obtain the optimal cyclic rotation schedule for the multiple products system. Besides the decision variables studied in the classical economic lot scheduling problem (ELSP), the production rate is also a decision variable in our model. We prove that our solutions improve the results of the classical ELSP.

This content is not available in your region!

Continue researching here.

Having issues? You can contact us here