Premium
HYDRODYNAMIC SIMULATIONS OF A CONSTRUCTED WETLAND IN SOUTH FLORIDA 1
Author(s) -
Guardo Mariano,
Tomasello Richard S.
Publication year - 1995
Publication title -
jawra journal of the american water resources association
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.957
H-Index - 105
eISSN - 1752-1688
pISSN - 1093-474X
DOI - 10.1111/j.1752-1688.1995.tb03394.x
Subject(s) - environmental science , stormwater , hydrology (agriculture) , surface runoff , wetland , water quality , flow routing , hydraulics , constructed wetland , routing (electronic design automation) , combined sewer , environmental engineering , geology , sewage treatment , geotechnical engineering , engineering , ecology , aerospace engineering , biology , electronic engineering
This paper describes the application of the SHEET2D model to the Florida's Everglades Nutrient Removal (ENR) Project. The ENR Project is a 3815 acre (1545 ha) pilot project, located in Palm Beach County. The operation of the treatment system will be used to demonstrate the performance of larger scale constructed wetland systems for removal of phosphorus from Everglades Agricultural Area (EAA) stormwater runoff. It is currently the largest stormwater wetland treatment system in the world. The SHEET2D model was used to analyze the performance of the ENR Project. SHEET2D is a two‐dimensional, depth‐averaged hydrodynamic model that is applicable to shallow water flow conditions. Subsequently, results from SHEET2D simulations were used to develop the ENEMOD model. ENRMOD is a lumped parameter box water quality model that can be used to analyze the long term performance of the ENR project with respect to hydrology and phosphorus uptake. Localized short‐circuiting in the agricultural ditches within the project area was analyzed by using the RBFVM‐2D model, which is a finite volume hydrodynamic model that is also applicable to shallow water flow conditions. The SHEET2D model was employed to simulate the hydraulics of the structures between cells and the hydrodynamics of the sheet‐flow moving across the buffer cell and treatment cells. Collection, distribution, and larger discharge canals within the project were simulated by means of the MultiBasin Routing (MBR) model features that are built into the SHEET2D model. Constant inflows (75 to 600 cfs [2.1 to 17 m 3 /s]) were used in all runs to simulate the discharge of the ENR Project based on the proposed operating schedule for the outflow pump station. The model simulated 30 days to reach steady state conditions. Under steady state conditions, the hydraulic retention times were computed for the project and the split of flow between the two treatment trains of the entire project from the common buffer cell. Additionally, design components such as height of the levees, capacity of the structures, and hydrographs at specified grids were obtained.