Premium
LAKE SUPERIOR REGULATION EFFECTS
Author(s) -
Quinn Frank H.
Publication year - 1978
Publication title -
jawra journal of the american water resources association
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.957
H-Index - 105
eISSN - 1752-1688
pISSN - 1093-474X
DOI - 10.1111/j.1752-1688.1978.tb02252.x
Subject(s) - natural (archaeology) , period (music) , hydrology (agriculture) , environmental science , geology , geography , geotechnical engineering , archaeology , physics , acoustics
The outflows of Lake Superior through the St. Marys River have been modified from natural conditions, initially by the construction of engineering works, such as bridges, and later by the construction of control works and the regulation of the lake. For all practical purposes, the period from 1860 to 1887 represents the natural river conditions. During the period 1888‐1900 the regimen was modified by the construction of the International Railroad Bridge and the Chandler‐Dunbar Power Canal. In 1901 construction began on the compensating works. Following the completion of the compensating works in August 1921, the Lake Superior outflows were regulated in accordance with the Orders of Approval, 26 and 27 May 1914. A hydrologic response model was developed to simulate the natural Lake Superior regime. The model was run for the 1860–1975 period to simulate natural Lake Superior levels and outflows. The simulated levels were compared with the recorded levels to determine the effect of regulation. It was found that regulation has resulted in a rise in Lake Superior water levels. The simulated natural outflows for the period from 1937 to 1975 were run through the Great Lakes hydrologic response model to analyze the regulation effects on Lakes Michigan‐Huron, St. Clair, and Erie. The results show no long‐term bias due to regulation.