Premium
VALIDATION OF BNR (BIOLOGICAL NUTRIENT REMOVAL) PLANT
Author(s) -
Hale C.,
Kaur K.,
Jones N.,
Oliver B.
Publication year - 2005
Publication title -
water and environment journal
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.437
H-Index - 37
eISSN - 1747-6593
pISSN - 1747-6585
DOI - 10.1111/j.1747-6593.2005.tb00576.x
Subject(s) - biochemical oxygen demand , nutrient , phosphate , ammonia , chemistry , pilot plant , wastewater , environmental chemistry , environmental science , pulp and paper industry , chemical oxygen demand , environmental engineering , organic chemistry , engineering
Llangefni WwTW receives discharge from the rural town of Llangefni and the local industrial estate and to date this is the first and only BNR plant in Wales. The consents from March 2003 included a reduction in ammonia (NH 4 _N) to 1.5 mg/l, suspended solids to 20 mg/l (SS) and Biological Oxygen Demand (BOD) to 7 mg/l and included a new Phosphate (PO 4 _P) standard of 2 mg/l. The process selected to meet the new consents was Biological Nutrient Removal (BNR) and was unusual as it was for a small, rural wastewater treatment plant that receives about 26% of its flow from an industrial estate. During commissioning, the plant produced an average phosphate concentration of 1.0 mg/l and an ammonia concentration of 0.7 mg/l. It was confirmed that to achieve consistent phosphate removal a BOD:P ratio greater than 20:1 is required along with a high VFA (Volatile Fatty Acids) concentration of 200–300 mg/l.