z-logo
Premium
Diversion of the River Calder at Welbeck: An Engineering and Environmental Challenge
Author(s) -
McDONALD C.,
RICKARD C. E.
Publication year - 1992
Publication title -
water and environment journal
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.437
H-Index - 37
eISSN - 1747-6593
pISSN - 1747-6585
DOI - 10.1111/j.1747-6593.1992.tb00738.x
Subject(s) - land reclamation , landform , coal mining , channel (broadcasting) , environmental science , civil engineering , water resource management , coal , engineering , geology , waste management , geography , archaeology , paleontology , electrical engineering
The Welbeck reclamation and landfill project (near Wakefield) is reclaiming over 1.5 km 2 of former aggregate and colliery workings through the creation of a new landform. This is to incorporate millions of tonnes of colliery spoil and controlled (i.e. household, trade) wastes, and to avoid the need for disposal on less suitable sites elsewhere. The scheme is already under way, but the proposed diversion of the River Calder to one side of the site would more than double its capacity for landfill. In environmental terms, the project has been seen as the creation of a new river corridor, rather than simply the diversion of a river channel. The paper outlines the engineering of the river diversion, which is routed for about 2 km through varied and difficult ground conditions, and gives a number of examples of the priority attached to landscape and after‐use factors, and their intrinsic importance in design.

This content is not available in your region!

Continue researching here.

Having issues? You can contact us here