z-logo
Premium
Long‐Term Confidence in Ground Water Monitoring Systems
Author(s) -
Perazzo James A.,
Dorrier Richard C.,
Mack James P.
Publication year - 1984
Publication title -
groundwater monitoring and remediation
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.677
H-Index - 47
eISSN - 1745-6592
pISSN - 1069-3629
DOI - 10.1111/j.1745-6592.1984.tb00902.x
Subject(s) - groundwater , borehole , water well , casing , environmental science , hydrogeology , hazardous waste , water quality , contamination , engineering , petroleum engineering , waste management , geotechnical engineering , ecology , biology
State‐of‐the‐art analytical techniques are capable of detecting contamination In the part per billion (ppb) range or lower. At these levels, a truly representative ground water sample Is essential to precisely evaluate ground water quality. The design specifications of a ground water monitoring system are critical in ensuring the collection of representative samples, particularly throughout the long‐term monitoring period. The potential interfaces from commonly used synthetic well casings require a thorough assessment of site, hydrogeology and the geochemical properties of ground water. Once designed, the monitoring system must be installed following guidelines that ensure adequate seals to prevent contaminant migration during the installation process or at some time in the future. Additionally, maintaining the system so the wells are in hydraulic connection with the monitored zone as well as periodically Inspecting the physical integrity of the system can prolong the usefulness of the wells for ground water quality. When ground water quality data become suspect due to potential interferences from existing monitoring wells, an appropriate abandonment technique must be employed to adequately remove or destroy the well while completely sealing the borehole. The results of an inspection of a monitoring system comprised of six 4‐inch diameter PVC monitoring wells at a hazardous well facility Indicated that the wells were improperly installed and in some cases provided a pathway for contamination. Subsequent down hole television inspections confirmed inaccuracies between construction logs and the existing system as well as identified defects in casing materials. An abandonment program was designed which destroyed the well casings in place while simultaneously providing a competent seal of the re‐drilled borehole.

This content is not available in your region!

Continue researching here.

Having issues? You can contact us here