z-logo
Premium
Master Production Scheduling Under Rolling Planning Horizons with Fixed Order Intervals
Author(s) -
Campbell Gerard M.
Publication year - 1992
Publication title -
decision sciences
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 1.238
H-Index - 108
eISSN - 1540-5915
pISSN - 0011-7315
DOI - 10.1111/j.1540-5915.1992.tb00391.x
Subject(s) - time horizon , scheduling (production processes) , safety stock , mathematical optimization , computer science , stock (firearms) , operations research , mathematics , engineering , mechanical engineering , supply chain , political science , law
Fixed interval scheduling is studied in the context of a rolling horizon framework that is developed by building on previous work in the master scheduling area. The rolling horizon framework includes a stationary scheduling model which uses the “time fencing’concept by partitioning the planning horizon into three sections. The lengths of these sections and the frequency at which the stationary problem is updated and resolved are discussed as parameters of the rolling horizon model. Two different interpretations of the freeze interval parameter are examined, enabling confirmation and clarification of results presented in an earlier study. Details are given for three methods of calculating safety stocks as a function of rolling horizon parameters, including a method which results in optimal safety stock levels. A comparison of the safety stock methods shows that the constant safety stock method can result in inventories that are significantly above optimal under certain conditions, whereas the constant service level method consistently yields nearly optimal results.

This content is not available in your region!

Continue researching here.

Having issues? You can contact us here