Premium
Re‐equipping a dyehouse for maximum productivity — the factors involved
Author(s) -
Gaunt J F,
Moffitt A B
Publication year - 1991
Publication title -
journal of the society of dyers and colourists
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.297
H-Index - 49
eISSN - 1478-4408
pISSN - 0037-9859
DOI - 10.1111/j.1478-4408.1991.tb01303.x
Subject(s) - productivity , computer science , work (physics) , manufacturing engineering , mechanical engineering , engineering , economics , macroeconomics
Before an existing dyehouse can be re‐equipped for maximum productivity, substantial changes in machinery, techniques and in personnel attitudes are needed. These are described, along with an outline of further work that will be undertaken when suitable equipment becomes available.