z-logo
Premium
The critical points of production rate under vendor–buyer coordination: explicit solutions
Author(s) -
David Israel,
Herbon Avi
Publication year - 2021
Publication title -
international transactions in operational research
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 1.032
H-Index - 52
eISSN - 1475-3995
pISSN - 0969-6016
DOI - 10.1111/itor.12840
Subject(s) - production (economics) , upper and lower bounds , guard (computer science) , mathematical optimization , vendor , constraint (computer aided design) , constant (computer programming) , value (mathematics) , production rate , mathematics , computer science , operations research , economics , microeconomics , statistics , business , industrial engineering , mathematical analysis , geometry , marketing , engineering , programming language
This paper revisits the deterministic joint vendor–buyer production‐inventory problem and assumes that the production rate can be controlled. To guard against unwarranted extreme solutions, such as too abrupt production or, on the other hand, everlasting production aligned with demand, we place lower and upper bounds on the production rate. In addition, we incorporate an independent upper bound on the overall cycle of producing and remaining idle. Through identifying several critical points of the production rate, we solve the resulting problem for the optimal triplet ( P , Q , n ), where P is the constant production rate, a key decision variable, Q is the entire lot size produced in a cycle, and n is the number of equal successive shipments of this lot to the buyer. Our own treatment is purely analytical, which adds value from a theoretical perspective. Worst values of the production rate, when the other decision values are optimal for P , are found. We prove that only two production rates, the lowest and the highest, can yield minimal joint costs, and we identify which of the two is optimal under given relative positions of the defined critical points. Numerical illustration indicates that the joint cost sharply increases for small values of the bound on the overall cycle length. This study highlights the importance of solving variants of the suggested model and of developing managerial alternatives that relax this constraint as much as possible.

This content is not available in your region!

Continue researching here.

Having issues? You can contact us here