Pioneer Development of Facility Construction Territory
Author(s) -
Pavel Oleinik
Publication year - 2020
Publication title -
iop conference series. materials science and engineering
Language(s) - English
Resource type - Journals
eISSN - 1757-899X
pISSN - 1757-8981
DOI - 10.1088/1757-899x/960/4/042080
Subject(s) - schedule , downtime , work (physics) , plan (archaeology) , organizational structure , duration (music) , operations research , project management , computer science , facility management , work breakdown structure , construction engineering , engineering management , operations management , engineering , systems engineering , business , project planning , opm3 , management , mechanical engineering , geography , art , literature , archaeology , marketing , economics , operating system
Peculiarities of pioneer development of facility construction territory in hard-to-reach and underdeveloped areas are considered. It is given the specificity and variety of work for the implementation of which it is advisable to organize a complex flow. The procedure of technological calculations and the construction of the corresponding cyclogram and schedule of pioneer development of the territory, which should be part of the facility construction schedule of the construction management plan, is disclosed. Such a schedule is the basis not only for determining the need for employees, construction equipment, materials, and structures, but also for creating schedules for employees’ work and rest periods and their turnover during the pioneer development of the territory. The main goal of this work is to improve in-line construction methods using advanced organizational and technological solutions for pioneering the development of the territory for the future construction of buildings and structures. This approach allows, as a result of the application and implementation of the described principles, to form the optimal organizational and technological scheme for carrying out strip-mounting works taking into account the specifics of pioneer development and the preparatory period as a whole. In addition, the principles being implemented significantly affect the duration of work and minimize downtime of construction flows. As a result of the study, the author provides a generalized system of principles for rationalizing organizational and technological solutions for the pioneer development of construction territories., Which in the future can be used as the basis of an automated apparatus for optimizing the model of building an object in pioneer territories through the use of cyclograms and advanced mathematical methods.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here