
Improvement of the efficiency of horizontal wells
Author(s) -
R. A. Kozikhin,
И. Г. Фаттахов,
Л. С. Кулешова,
В. К. Андреев,
А. Р. Сафиуллина,
A. Kh Gabbasov,
I. G. Andaryanov
Publication year - 2020
Publication title -
iop conference series. materials science and engineering
Language(s) - English
Resource type - Journals
eISSN - 1757-899X
pISSN - 1757-8981
DOI - 10.1088/1757-899x/952/1/012056
Subject(s) - petroleum engineering , permeability (electromagnetism) , geology , drilling , wellbore , water flooding , flooding (psychology) , directional drilling , environmental science , geotechnical engineering , engineering , mechanical engineering , psychology , genetics , membrane , psychotherapist , biology
The research purpose is to identify factors of premature flooding of wells, assess the influence of factors, simulate and compare results obtained with field data. An analysis of the reservoir properties, design and development indicators of horizontal wells showed that only 41% of cases of premature flooding are due to geological causes (heterogeneity of rock permeability). Technological reasons (high specific samplings) occur in 36% of cases, this problem is pronounced in wells where new technologies were implemented – division of the wellbore into sections using water and oil swell packers. In 23% of cases, premature flooding is due to wellbore drilling in the water-saturated zone.