z-logo
open-access-imgOpen Access
Methods of risk minimization in investment and construction projects
Author(s) -
И. В. Сухорукова,
Д.А. Максимов,
Г. П. Фомин
Publication year - 2020
Publication title -
iop conference series. materials science and engineering
Language(s) - English
Resource type - Journals
eISSN - 1757-899X
pISSN - 1757-8981
DOI - 10.1088/1757-899x/945/1/012013
Subject(s) - minification , risk analysis (engineering) , risk management , work (physics) , investment (military) , order (exchange) , computer science , risk assessment , operations research , engineering , business , mechanical engineering , finance , politics , law , political science , programming language , computer security
The paper puts forward a hypothesis about the possible integration of risk assessment methods in order to minimize them in investment and construction projects, for that the problems of risk minimization in the management and implementation of construction projects are considered. A critical review of existing methods of risk analysis is carried out and a method of risk minimization is proposed based on the creation of a “Construction risk Informatoria” and methods for optimizing the reallocation of resources according to the minimum time criterion, which determines the risk of lost profits. The example of the use of risk minimization methods in the optimization procedure for network models of low-rise building construction is given, and the composition of the application of mathematical methods and models that contribute to increasing the economic effect in this area is described. As a result, effective recommendations were developed in the form of tools for monitoring the dynamics of construction work to prevent risk situations.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here