Optimization of the duration of the pioneer construction period
Author(s) -
Pavel Oleinik,
Тatyana Kuzmina,
Diana Zueva,
Mariya Balmashnova
Publication year - 2020
Publication title -
iop conference series. materials science and engineering
Language(s) - English
Resource type - Journals
eISSN - 1757-899X
pISSN - 1757-8981
DOI - 10.1088/1757-899x/869/6/062006
Subject(s) - scope (computer science) , duration (music) , work (physics) , statement of work , task (project management) , quality (philosophy) , process (computing) , operations research , operations management , computer science , architectural engineering , engineering , systems engineering , mechanical engineering , art , philosophy , literature , epistemology , programming language , operating system
The construction of facilities in hard-to-reach and underdeveloped areas is an extremely difficult task, the solution of which largely depends on the quality and timely development of the construction area. Significant reserves for reducing the territories pioneer duration are in the combination of the pioneer construction and preparatory periods. To this end, on the basis of a generalization of practical experience, a methodology for linking work is proposed, based on the found equations of communication between the scope of work, the intensity of consumption of labor and technical resources, and the duration of work. The options for changing the scope of work: from the minimum size of the work area per team to the full work area for the whole process are examined and the conditions for rational combination of the pioneer construction and preparatory periods are disclosed.