z-logo
open-access-imgOpen Access
Platelet Inventory Management System Using Monte Carlo Simulation
Author(s) -
Agus Mansur,
FI Mar’ah,
Putri Amalia
Publication year - 2020
Publication title -
iop conference series. materials science and engineering
Language(s) - English
Resource type - Journals
eISSN - 1757-899X
pISSN - 1757-8981
DOI - 10.1088/1757-899x/722/1/012004
Subject(s) - economic shortage , inventory management , stockout , monte carlo method , blood management , operations management , blood units , computer science , blood transfusion , medicine , engineering , statistics , surgery , mathematics , linguistics , philosophy , government (linguistics)
Improper of blood management will lead to wastage due to the nature of blood that is not durable and easily damaged, so if the blood is stored too much and not used until the expired date, the blood will be damaged. Platelet components have a limited lifetime for 5 days. With a short blood age, every month there will be two possibilities, one is shortage of blood inventory (stockout) or two, over blood inventory (overstock) in the storage area. From the data obtained, the expired rate in 2017 reached 743 blood bags. Until now Indonesian Red Cross has not been able to predict the level of blood demand because of the uncertain level of demand. In this study, simulation will use Monte Carlo to develop a number of policies that can optimize inventory levels and minimize inventory costs.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here