Operation Performance and Economic Efficiency Analysis of Power Plant Boilers Ultra-low Emission Facilities
Author(s) -
Hai Wang
Publication year - 2020
Publication title -
iop conference series. materials science and engineering
Language(s) - English
Resource type - Journals
eISSN - 1757-899X
pISSN - 1757-8981
DOI - 10.1088/1757-899x/721/1/012036
Subject(s) - economizer , power station , reliability (semiconductor) , environmental science , boiler (water heating) , efficient energy use , flue gas desulfurization , automotive engineering , process engineering , engineering , reliability engineering , waste management , power (physics) , electrical engineering , mechanical engineering , physics , heat exchanger , quantum mechanics
In this paper, four units of a power plant are taken as the research object, and the air pollutant emission performance standards, equipment installed economic efficiency, operational economic efficiency and energy saving potential of four units using different technical methods for ultra-low emission transformation are analyzed. Take unit 4 as an example, the ultra-low emission operation cost is discussed. The results show that the operation performance, stability and reliability of some units of low-temperature economizer need to be improved; the K values of different ultra-low emission technology methods were between 7.6∼12kW/MW. The installation of a low temperature economizer allows the wet desulfurization facility to have a greater water saving capacity.