Study on Key Construction Procedures of CRD Method for Re Shuitang No.3 Tunnel
Author(s) -
Zhongwei Wang,
Ruihuai Yang,
Hongyan Guo,
Ke Li
Publication year - 2020
Publication title -
iop conference series. materials science and engineering
Language(s) - English
Resource type - Journals
eISSN - 1757-899X
pISSN - 1757-8981
DOI - 10.1088/1757-899x/711/1/012074
Subject(s) - tunnel construction , vault (architecture) , process (computing) , structural engineering , key (lock) , engineering , geotechnical engineering , computer science , geology , construction engineering , civil engineering , computer security , operating system
Controlling the critical construction steps of the CRD method plays an important role in ensuring construction and ensuring construction safety. When using the CRD method for the construction of the Re Shuitang No. 3 tunnel, through the numerical simulation of the initial support structure and the temporary support structure during the tunnel construction process, it is concluded that the left upper step, the upper right step and the temporary support structure are obviously stressed. Construction steps. According to the analysis results, the surrounding rock of the vault should be strengthened in advance, and the second lining structure should be applied after the surrounding rock is stabilized.