z-logo
open-access-imgOpen Access
Implementing Three-Variance Approach for Project Time and Cost Control in a Building Construction Project (Case Study: A Project in West Java)
Author(s) -
L Friescilia,
Onnyxiforus Gondokusumo
Publication year - 2019
Publication title -
iop conference series. materials science and engineering
Language(s) - English
Resource type - Journals
eISSN - 1757-899X
pISSN - 1757-8981
DOI - 10.1088/1757-899x/650/1/012010
Subject(s) - earned value management , computer science , control (management) , java , variance (accounting) , work breakdown structure , project management , operations research , work (physics) , estimation , project planning , systems engineering , engineering , project charter , business , artificial intelligence , accounting , programming language , mechanical engineering
Earned Value Method (EVM) is one of project controlling methods. This method has been widely used in many projects since long time ago. However, this traditional EVM still has some shortcomings that related to time aspect, such as the use of monetary units, also the time aspect and work aspect are not measured separately. To overcome these shortcomings, several researches have been carried out and one of them is Three-Variance Approach (TVA). This paper proposed the use of EVM and TVA and compared the result from those methods. This paper also aimed to identify the strengths and problems that may arise when using TVA in a real project. The results are visualized with graphs, then be gathered into three categories; project status, forecasting, and trend. Project status determines the condition of the project in each period. Forecasting enables one to estimate the final condition of a project. The improvement of project condition from time to time can be seen in trend.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here