z-logo
open-access-imgOpen Access
A Production Planning and Scheduling Method Based on Heuristic Rules for Forming-sintering Production System
Author(s) -
Zhengmin Zhang,
Zailin Guan,
Lei Yue,
Chuangjian Wang,
Hao Wang
Publication year - 2019
Publication title -
iop conference series. materials science and engineering
Language(s) - English
Resource type - Journals
eISSN - 1757-899X
pISSN - 1757-8981
DOI - 10.1088/1757-899x/565/1/012001
Subject(s) - bottleneck , production planning , sintering , scheduling (production processes) , computer science , production (economics) , process (computing) , heuristic , production control , continuous production , plan (archaeology) , process engineering , industrial engineering , manufacturing engineering , mathematical optimization , materials science , engineering , metallurgy , embedded system , mathematics , history , archaeology , artificial intelligence , economics , composite material , macroeconomics , operating system
The forming-sintering process is the bottleneck of the magnetic material manufacturing system in general, which restricts the overall output of the workshop. It is hard to formulate a production plan due to the complex constraints in such production system. In current research, the production planning control framework integrated with DBR (Drum-Buffer-Rope) concept oriented for forming-sintering process is designed. Moreover, a heuristic method considering the constraints of the magnetic material production process is proposed, which standardize and optimize the preparation process of the forming-sintering production plan. The practical application indicates that the heuristic method greatly reduces the number of WIPs, shortens the order manufacturing cycle, and improves the on-time delivery rate and the utilization rate of the sintering furnace, as compared with the current planning method of the enterprise.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here