z-logo
open-access-imgOpen Access
Pre-design plant of cellulose acetate from sugarcane bagasse using the Emil Heuser Method with a production capacity of 10,000 tons/year
Author(s) -
Bambang Trisakti,
Irvan Irvan,
Renita Manurung,
Indra Surya,
Rivaldi Sidabutar,
Muhammad Alfayed,
N. Alfaizah,
Desriwanty Sitorus,
Deri Ardiansyah
Publication year - 2021
Publication title -
iop conference series. materials science and engineering
Language(s) - English
Resource type - Journals
eISSN - 1757-899X
pISSN - 1757-8981
DOI - 10.1088/1757-899x/1122/1/012107
Subject(s) - bagasse , cellulose acetate , pulp and paper industry , factory (object oriented programming) , production (economics) , profit (economics) , cellulose , business , internal rate of return , waste management , chemistry , engineering , economics , computer science , organic chemistry , microeconomics , macroeconomics , programming language
Cellulose acetate is a cellulose derivative product that has high commercial value because it is widely applied to textile fibers, cigarette filters, plastics, photographic films, paper and membrane coatings. The need for cellulose acetate in Indonesia is quite large because Indonesia is one of the largest textile producing countries in the world. However, Indonesia does not yet have a factory that produces cellulose acetate. Therefore, the establishment of a cellulose acetate factory has a large market opportunity for domestic and foreign needs. The pre-designed plant of cellulose acetate from sugarcane using the Emil Heuser method is planned to operate with a production capacity of 10,000 tons/year. The factory location will be on Raya Krembung road, Krembung region, Sidoarjo Regency, East Java, Indonesia. The land area required is 25,000 m2. The planned of business entity is a Limited Liability Company (Ltd). The pre-designed plant has a Profit Margin of 41.69%, Break Even Point 30.99%, Return on Investment 27.53%, Pay Out Time 3 years 6 months 3 days, Return on Network 44.88%, and Internal Rate of Return 35.99%. Based on the analysis of this economic aspect, it can be concluded that this factory is feasible to be established.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here