z-logo
open-access-imgOpen Access
The comparative analysis of the stress-strain state of the support of the escalator tunnel constructed in weak soils by the NATM
Author(s) -
А. V. Radkevych,
O. L. Tiutkіn,
Volodymyr Kuprii,
S. I. BIELIKOVA
Publication year - 2022
Publication title -
iop conference series earth and environmental science
Language(s) - English
Resource type - Journals
eISSN - 1755-1307
pISSN - 1755-1315
DOI - 10.1088/1755-1315/970/1/012002
Subject(s) - new austrian tunnelling method , massif , cementation (geology) , engineering , geotechnical engineering , stress (linguistics) , railway tunnel , civil engineering , structural engineering , geology , geography , archaeology , linguistics , philosophy , geochemistry , cement , excavation
The construction of underground objects of the subway is always associated with building of structures connecting the surface. For subways, such structures are escalator tunnels. During the construction of the Dnipro Metro, these underground structures are built using a new technology that forms a multilayered support. This technology is the New Austrian tunneling method. A special feature of its application under the conditions of the Dnipro city is the existence of weak rocks in the upper part of the escalator tunnel. To ensure their stability, various special operational techniques are used that impact the rock massif. The basic techniques include artificial freezing, which was the dominant strengthening technology, and chemical strengthening (cementation), which is more consistent with the New Austrian tunneling method. To elucidate the effectiveness of the two strengthening techniques, a finite-element model of the Dnipro Metro escalator tunnel has been built. The numerical calculation of two variants for the strengthening of weak soils yielded results for a comparative analysis of the stress-strain state. The result of the comparative analysis is the conclusion of greater cementation efficiency when strengthening weak soils of the massif in which the escalator tunnel is constructed using New Austrian tunneling method.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom