
Periodic tunnelling reloaders improvement
Author(s) -
A.S. Nosenko,
Alexey A. Domnitsky,
V V Nosenko,
M S Altunina,
В. В. Зубов,
I A Kirsanov
Publication year - 2021
Publication title -
iop conference series. earth and environmental science
Language(s) - English
Resource type - Journals
eISSN - 1755-1307
pISSN - 1755-1315
DOI - 10.1088/1755-1315/848/1/012141
Subject(s) - reciprocating motion , quantum tunnelling , bunker , wedge (geometry) , traction (geology) , engineering , swing , computer science , mechanical engineering , geometry , physics , mathematics , coal , optoelectronics , gas compressor , waste management
The investigated object - periodic action tunnelling bunker-loaders. It is proposed to increase the mining operations efficiency by introducing an intermediate loading and transport element in a periodic action bunker-reloader form into the tunnelling machine - main transport technological chain, which ensures mining machine continuous operation while implementing the minimum time for loading a vehicle. It has been established that there is an experience in the bunker designs - loaders use with a traction-transporting body reciprocating movement: the transporting elements wedge-shaped or with variable geometry. To eliminate the identified shortcomings, fundamentally new technical solutions are proposed, based on a forward-acting hydraulic drive and transported elements use that provide material single movement in large volumes, at their movement low speeds. A proposed design detailed description protected by RF patents is given. The methodology general provisions for conducting experimental studies on a model setup are considered.