z-logo
open-access-imgOpen Access
Experimental Study on Base Piles Bearing Capacity of Qilu Yellow River Bridge
Author(s) -
Pingsheng Dong,
Xiang Wang,
Hu Wang
Publication year - 2021
Publication title -
iop conference series. earth and environmental science
Language(s) - English
Resource type - Journals
eISSN - 1755-1307
pISSN - 1755-1315
DOI - 10.1088/1755-1315/825/1/012018
Subject(s) - pile , bearing capacity , geotechnical engineering , bridge (graph theory) , foundation (evidence) , bearing (navigation) , load testing , load bearing , dynamic load testing , structural engineering , geology , engineering , computer science , archaeology , geography , medicine , artificial intelligence
Qilu Yellow River Bridge is located in Jinan City, Shandong Province. The main bridge adopts bored pile foundation with high design bearing capacity. In order to ensure that the bearing capacity of single pile meets the requirements and ensure the safety of the bridge, the double load boxes O-cell test pile method is used to test the bearing capacity of pile before and after grouting. According to the soil layer property around pile, the double load boxes can be loaded optionally and solve the problems in the tradition pile test. The bearing capacity of each pile section is determined. The bearing capacity of pile before grouting is 75255kN, the bearing capacity of pile after grouting is 89100 kN.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here