Integration building information modeling (BIM) to track the time for controlling of budget and labor productivity (case study: warehouse project)
Author(s) -
Rifqi Waladi Wicaksono,
Godeliva Juliastuti,
Putri Arumsari
Publication year - 2021
Publication title -
iop conference series. earth and environmental science
Language(s) - English
Resource type - Journals
eISSN - 1755-1307
pISSN - 1755-1315
DOI - 10.1088/1755-1315/794/1/012037
Subject(s) - building information modeling , productivity , track (disk drive) , process (computing) , information flow , duration (music) , computer science , process management , engineering management , construction engineering , engineering , operations management , scheduling (production processes) , economics , macroeconomics , operating system , art , linguistics , philosophy , literature
The rapidly growing world of construction in Indonesia will require more effective support technology. Technological developments in construction are under construction called as Building Information Modeling (BIM). Before Developing Modeling Information (BIM), AutoCAD, SAP2000, Ms. Project is often used for design and project planning. The use of the applications cannot be integrated. It can be implemented as needed. Building Information Models (BIM) encourages the flow of 3D models across different disciplines, so that the process is faster and more direct. Currently, many actors have never adopted in the construction in Indonesia, even not yet understand about Building Information Modeling (BIM). The result of this study is the steel weight for the column is 1,151,596.35 kg. The duration of project with acceleration is 475 days. The labor productivity divided based on the experience, age and education.