
Analysis of potential tapping and efficiency increasing measures of reservoir measures in late stage of oilfield development
Author(s) -
Liang Chen,
Liqun Gao,
Liang Wang,
Yang Lei,
Wei Zan,
Feng Li,
Zihan Ma
Publication year - 2021
Publication title -
iop conference series. earth and environmental science
Language(s) - English
Resource type - Journals
eISSN - 1755-1307
pISSN - 1755-1315
DOI - 10.1088/1755-1315/781/2/022093
Subject(s) - petroleum engineering , environmental science , resource (disambiguation) , crude oil , oil production , production (economics) , engineering , computer science , computer network , economics , macroeconomics
In the process of oilfield development, with the continuous development of resource exploitation and oil transportation, the later exploitation is likely to reduce the potential energy of the oilfield, which has a serious impact on the oil exploitation. In order to make our oilfield development efficiency has been significantly improved, and effectively improve the comprehensive development and utilization efficiency of our oilfield, we must continue to use the oilfield potential enhancement technology. In the actual production process, we need to combine a variety of technologies, such as hydraulic transmission pressure fracture, water plugging, acidification and other technologies. Through the comprehensive utilization of these technologies, we can reduce the water content of comprehensive oil wells in the oilfield, effectively improve the production of the oilfield, bring greater economic benefits to the society, and promote the long-term, stable and healthy development of China’s oilfield.