
Optimization Research on Centralized Monitoring Design of Ternary M1 Joint Station
Author(s) -
Siqiang Fu
Publication year - 2021
Publication title -
iop conference series. earth and environmental science
Language(s) - English
Resource type - Journals
eISSN - 1755-1307
pISSN - 1755-1315
DOI - 10.1088/1755-1315/781/2/022035
Subject(s) - upload , production (economics) , control (management) , quality (philosophy) , joint (building) , computer science , mode (computer interface) , engineering , real time computing , civil engineering , operating system , philosophy , epistemology , artificial intelligence , economics , macroeconomics
In the centralized monitoring construction mode of oilfield stations, the original duty posts set by functional units are cancelled, and a centralized control room is set up to transmit the production data information to the central control room and then upload it to the higher-level production command system step by step, so as to realize remote monitoring, centralized duty, unified layout, unified monitoring and unified management in the station. The density of well pattern and stations in old oilfields is large. With the construction of productivity projects, it is necessary to make rational use of existing facilities to complete the optimization study of centralized monitoring design of new stations, so as to reduce the difficulty of production management, improve the quality of monitoring system and improve the level of production management. In this paper, the centralized monitoring design of ternary M1 joint station is optimized through comparison and selection of multiple schemes, and a reasonable monitoring system construction mode is selected according to each station’s own situation, so as to simulate the employment situation of production operation management, fully analyze and consider the production management needs, and avoid affecting the production operation due to the omission of centralized monitoring design.