
Research on Online Monitoring System for Dielectric Loss of High Voltage Equipment in Substation
Author(s) -
Yun Guo,
Minhu Xu,
Hang Zhang,
Rui Zhang,
Kexin Zhang,
Yang Zhou
Publication year - 2021
Publication title -
iop conference series. earth and environmental science
Language(s) - English
Resource type - Journals
eISSN - 1755-1307
pISSN - 1755-1315
DOI - 10.1088/1755-1315/769/4/042024
Subject(s) - capacitive sensing , electrical engineering , voltage , high voltage , terminal (telecommunication) , current (fluid) , transmission (telecommunications) , synchronization (alternating current) , computer science , data transmission , data collection , electronic engineering , engineering , telecommunications , channel (broadcasting) , mathematics , statistics
In view of the remote collection of voltage and current in the online monitoring system for dielectric loss of high-voltage capacitive equipment in substations, it will lead to the problem of difficult to guarantee collection synchronization and large data transmission. The paper cleverly borrows AC 220V voltage as the reference phase, current and voltage monitoring terminal Calculate the phase relationship between the current, voltage and the reference phase of the capacitive device, and send it to the master station as an intermediate result. The master station calculates the dielectric loss of the capacitive device and forms a demand report. This method avoids the problem that the current and voltage acquisition is difficult to synchronize, and can greatly reduce the system cost and the amount of transmitted data. Because the terminals are calculated separately, the real-time performance of the monitoring system is improved.