z-logo
open-access-imgOpen Access
Analysis of deformation and failure characteristics of soft and broken surrounding rocks of super-large section tunnel constructed using benching tunneling method
Author(s) -
Fei Wan,
Chongtao Fu,
Changwu Zhou,
Lei Li,
Xuan Zhang
Publication year - 2021
Publication title -
iop conference series. earth and environmental science
Language(s) - English
Resource type - Journals
eISSN - 1755-1307
pISSN - 1755-1315
DOI - 10.1088/1755-1315/769/3/032058
Subject(s) - deformation (meteorology) , quantum tunnelling , geology , geotechnical engineering , instability , arch , excavation , front (military) , settlement (finance) , structural engineering , mechanics , materials science , engineering , physics , oceanography , optoelectronics , world wide web , computer science , payment
The benching tunneling method can overcome the problems of insufficient working space and low construction efficiency in the soft and broken surrounding rock tunnel with super large section, but the design and construction theory and method are under developing. In order to solve the problem of insufficient basis for the design of the large-section bench method in the weak and broken surrounding rock, a three-dimensional elastoplastic model was established. The deformation and fracturing of the surrounding rock outside the tunnel excavation profile and in front of the tunnel face were used as indicators to analyze the deformation and failure characteristics of the weak and broken surrounding rock under benching tunneling method. The calculation results show that the grade of surrounding rock worsens (grade IV-V). Depending on the initial support design conditions, instability of the supporting structure or the tunnel face may occur. In the condition that grade of surrounding rock does not lose stability, the leading deformation accounts for a larger proportion of the whole deformation, indicating that the leading deformation is the key to the stability control in the benching tunneling method. When the tunnel face is unstable, the surrounding rock within 4.5m in front of the tunnel and 1.5m above the arch collapses, and the deformation and damage develop from the vault down to the foot of the wall.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here