
Installation and construction technology of steel column under cup foundation of industrial plant
Author(s) -
Fulian He,
Yuying Wang
Publication year - 2021
Publication title -
iop conference series. earth and environmental science
Language(s) - English
Resource type - Journals
eISSN - 1755-1307
pISSN - 1755-1315
DOI - 10.1088/1755-1315/768/1/012129
Subject(s) - column (typography) , foundation (evidence) , welding , factory (object oriented programming) , engineering , structural engineering , steel mill , mechanical engineering , metallurgy , materials science , computer science , connection (principal bundle) , archaeology , programming language , history
This article introduces the installation process of the steel structure column of a single-storey industrial factory building on a cup-shaped foundation, through the use of column bottom angle steel welding treatment, steel wedges, jacks, and the coordinated use of cable wind ropes, the steel column elevation adjustment measures are finally determined, which solves the elevation deviation caused by the cup-shaped steel column installation and the difficulty in the steel column hoisting process Controlled construction technology issues.