
Design of Distribution Automation Master Station System Integration Scheme Based on “n + 1” Architecture
Author(s) -
Dong Xia,
Bo Sun,
Lin Zhu,
B H Wang,
Yanghao Zhou
Publication year - 2021
Publication title -
iop conference series. earth and environmental science
Language(s) - English
Resource type - Journals
eISSN - 1755-1307
pISSN - 1755-1315
DOI - 10.1088/1755-1315/701/1/012070
Subject(s) - master station , software deployment , automation , mode (computer interface) , process automation system , architecture , synchronization (alternating current) , grid , master/slave , computer science , state (computer science) , engineering , telecommunications , operating system , mechanical engineering , art , channel (broadcasting) , geometry , mathematics , algorithm , transmission (telecommunications) , visual arts
More and more network and provincial companies within the State Grid have adopted the “n + 1” architecture, that is, the deployment of production control at the regional and municipal levels, and the centralized deployment of information management at the provincial level to build the distribution automation master station system. The main station system of information management regional can independently evolve into the distribution cloud main station. In response to the construction trend of “n + 1” architecture, an integrated scheme’ of distribution automation master station system based on “n + 1” mode is proposed, and it is verified and analyzed on the new generation of distribution master station system constructed by State Grid Ningxia Electric Power Company. The verification and analysis on the above show that this integrated solution can solve the problems of cross-regional data synchronization and distributed data storage based on the “N+1” mode of the power distribution master station system, while avoiding the repeated construction of the information management area. At the same time, this construction mode can reduce operating costs, improve the efficiency of distribution network data utilization. At present, this scheme has been applied in Sichuan, Inner Mongolia, Jiangsu and Shanghai Electric Power Company, has a strong demonstration.