
Application and analysis of inverted ruler method in vault settlement monitoring of underground excavation station
Author(s) -
Yiteng Xu,
Hao Guo
Publication year - 2021
Publication title -
iop conference series. earth and environmental science
Language(s) - English
Resource type - Journals
eISSN - 1755-1307
pISSN - 1755-1315
DOI - 10.1088/1755-1315/658/1/012029
Subject(s) - excavation , settlement (finance) , urban rail transit , ruler , rail transit , subway station , vault (architecture) , civil engineering , section (typography) , engineering , track (disk drive) , geotechnical engineering , transport engineering , computer science , structural engineering , mechanical engineering , physics , quantum mechanics , world wide web , payment , operating system
In the urban rail transit engineering, the construction of undercutting under the existing rail line is plagued by high construction risk and high monitoring accuracy requirements. Taking a station A in an urban rail transit project as an example, combined with the characteristics of the project, the monitoring scheme of vault settlement in the excavation section is formulated. In order to establish two sets of relatively independent elevation system and adopt the method of setting up independent station to measure the inverted ruler, the feasibility of this method is verified, and the sources of measurement error and control measures are analyzed. The actual results show that the method can meet the requirements of monitoring accuracy of vault settlement in the underground excavation section of subway station.