
Performance evaluation of main transformer equipment suppliers for 500kV main transformer equipment
Author(s) -
Yinghan Jiang,
Dong Liu,
yinghua Chen,
yanqin Ge,
Mingxue Wang,
Jinliang Zhang
Publication year - 2021
Publication title -
iop conference series. earth and environmental science
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.179
H-Index - 26
eISSN - 1755-1307
pISSN - 1755-1315
DOI - 10.1088/1755-1315/651/2/022047
Subject(s) - transformer , reliability engineering , fuzzy logic , power grid , evaluation methods , analytic hierarchy process , automotive engineering , computer science , engineering , electrical engineering , operations research , voltage , power (physics) , artificial intelligence , physics , quantum mechanics
Scientific evaluation of the main transformer equipment suppliers is the premise to ensure the cost control and safe operation of the power grid. Based on the analysis of various factors affecting the main transformer equipment supplier, the evaluation index of the main transformer equipment supplier is constructed. Considering the fuzziness of the evaluation index, the index weight is determined by AHP, and the evaluation model of main transformer equipment supplier based on fuzzy comprehensive evaluation is established. The example calculation shows that the fuzzy comprehensive evaluation method can fully reveal the evaluation index information and reflect the actual situation of main transformer equipment suppliers scientifically and reasonably.