z-logo
open-access-imgOpen Access
Ground Settlement analysis of Metro Interval using PBA method in the Loess region
Author(s) -
Hao Wu,
Baobing He,
Guitao Luan,
Junhao Zhu
Publication year - 2021
Publication title -
iop conference series. earth and environmental science
Language(s) - English
Resource type - Journals
eISSN - 1755-1307
pISSN - 1755-1315
DOI - 10.1088/1755-1315/636/1/012027
Subject(s) - settlement (finance) , loess , excavation , arch , civil engineering , interval (graph theory) , geotechnical engineering , metro station , engineering , geology , computer science , transport engineering , mathematics , combinatorics , geomorphology , world wide web , payment
In the construction of urban subway, the control of surface settlement has become the key and difficult point in the construction. As a common method in subway tunnel construction, PBA method has been widely used in many areas in China. This method performs well in settlement control. In addition, the supporting system of piles, beams, and arches formed during the construction process of this method effectively avoids the impact of the open-cut method on urban traffic. Therefore, this paper will combine the engineering conditions and the existing research results to simulate the various construction stages of the subway interval excavation in the loess area by establishing a Midas model. Combined with the results of numerical simulation, four increasing stages of surface settlement and corresponding settlement ratios are obtained, and the characteristics of surface settlement troughs are analyzed. This research is helpful to further understand the increasing law of ground settlement during the construction of metro interval in loess area.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here