Research On Auxiliary Decision-making Technology In the Early Stage of Power Network Base On Multi-plan Integration
Author(s) -
Mengxuan Liu,
Zihe Zhang,
Shunxian Zhang,
Xiaoliang Zhang,
Yixing Yin
Publication year - 2021
Publication title -
iop conference series. earth and environmental science
Language(s) - English
Resource type - Journals
eISSN - 1755-1307
pISSN - 1755-1315
DOI - 10.1088/1755-1315/621/1/012025
Subject(s) - plan (archaeology) , software deployment , computer science , scheme (mathematics) , network planning and design , power network , power grid , promotion (chess) , power (physics) , grid , network resource planning , site selection , operations research , electric power system , systems engineering , engineering , software engineering , telecommunications , mathematical analysis , physics , geometry , mathematics , archaeology , quantum mechanics , politics , political science , law , history
Under the current national comprehensive promotion and deployment of “building territorial spatial planning system and supervise its implementation” background, power network planning and construction must be based on the “multi-plan integration”, in line with the requirements of territorial spatial planning. This paper puts forward the construction scheme of the “early stage of power network auxiliary decision-making tool basing on multi-plan integration”. This tool is based on GIS technology to realize the intelligence, visualization and refinement of substation site and network path selection, which can solve the problem that at present, the grid planning is not coordinated, and inconsistent with other planning, and help improve the efficiency of power network planning and construction.