
Research and Application of Optimizing Pre-drainage Hole Layout along Seam
Author(s) -
Zhou Houquan,
Qianqian Ma
Publication year - 2020
Publication title -
iop conference series. earth and environmental science
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.179
H-Index - 26
eISSN - 1755-1307
pISSN - 1755-1315
DOI - 10.1088/1755-1315/565/1/012095
Subject(s) - drilling , borehole , geology , petroleum engineering , coal mining , bed , permeability (electromagnetism) , drainage , extraction (chemistry) , coal , geotechnical engineering , engineering , anisotropy , mechanical engineering , ecology , chemistry , physics , chromatography , quantum mechanics , membrane , biology , genetics , waste management
In order to solve the problem of the unsatisfactory pre-drainage effect of bedding holes, based on the theory of elastoplastic mechanics, the distribution of elastoplastic zone around the borehole and its influencing factors were analyzed, and it was found that the three-dimensional arrangement of the boreholes can increase the hole circumference of the drilled network Plastic zone volume, effective drilling length of borehole, coal seam permeability and gas drainage efficiency. Engineering application was carried out at the 3215working face of Wangpo Coal Mine. Three test schemes of dense parallel drilling, plane cross drilling and three-dimensional cross drilling were used, and the effect of extraction was investigated for comparative analysis. The test shows that the extraction efficiency of the three-dimensional cross-drilled hole is high, and the attenuation coefficient is small. Under the same amount of drilling, the extraction capacity of the three-dimensional cross-drilled hole is 1.7 times and 1.3 times that of the dense parallel drilling and plane cross-drilled hole. The drainage efficiency of three-dimensional cross drilling is 69% and 26% higher than that of dense parallel drilling and plane cross drilling, respectively.