z-logo
open-access-imgOpen Access
Study on determination method of economic limit water cut of water drive oilfield in ultra-high water cut stage
Author(s) -
Mao Yi-ping
Publication year - 2020
Publication title -
iop conference series. earth and environmental science
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.179
H-Index - 26
eISSN - 1755-1307
pISSN - 1755-1315
DOI - 10.1088/1755-1315/558/2/022059
Subject(s) - water cut , limit (mathematics) , cut off , petroleum engineering , stage (stratigraphy) , profit (economics) , oil field , environmental science , geology , engineering , mathematics , economics , mathematical analysis , paleontology , microeconomics , voltage , electrical engineering
According to the waterflooding characteristics in extra-high water cut stage of oilfield, a calculation model which is based on profit and loss balance principle has been created. This model can be used to identify the economic limit water cut of producers with different cost component. With the use of this model, the economic limit water cut in a development block of Daqing Oilfield with different oil prices has been calculated, and according to the economic benefit, producers have been classified into different group. This model is a significant basis of well shut-in and oil-field development.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here