z-logo
open-access-imgOpen Access
Research on Existing Problems and Improvement Measures of Fabricated Shear Wall
Author(s) -
Tongliang Xiao,
Hubing Li,
Ziyang Yu,
Yan Li
Publication year - 2020
Publication title -
iop conference series. earth and environmental science
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.179
H-Index - 26
eISSN - 1755-1307
pISSN - 1755-1315
DOI - 10.1088/1755-1315/525/1/012140
Subject(s) - shear wall , structural engineering , shear (geology) , slab , installation , joint (building) , engineering , connection (principal bundle) , computer science , mechanical engineering , materials science , composite material
When assembling the shear wall during hoisting and positioning, due to the many and dense reinforcements around the shear wall members, there are also many connection joints with other members, which makes the construction more difficult during assembly; it needs to be connected with the floor slab, too many connection joints are easy to bend the steel bar. This study proposes a shear wall positioning installation method. According to the parameters of the shear wall components, installing matching positioning braces before the components are hoisted can reduce unnecessary joint damage during the installation process and improve the efficiency of construction.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here