z-logo
open-access-imgOpen Access
Research on Construction Control of Semi Hybrid Steel-concrete Comoposite Cable-stayed Bridge
Author(s) -
Tiedong Qi,
Qingchen Yuan,
Lei Ma,
Dianyuan Liu,
Xiaolei Wang
Publication year - 2020
Publication title -
iop conference series. earth and environmental science
Language(s) - English
Resource type - Journals
eISSN - 1755-1307
pISSN - 1755-1315
DOI - 10.1088/1755-1315/510/5/052096
Subject(s) - bridge (graph theory) , structural engineering , girder , engineering , span (engineering) , civil engineering , beam (structure) , frame (networking) , mechanical engineering , medicine
Hong-shui river especially big bridge is a kind of semi hybrid steel-concrete comoposite cable-stayed bridge. The erection of Guizhou side span adopt the incremental launching construction method, which was composite beam; The erection of midspan adopt cable-stayed buckled method, which was composite beam; The erection of Guangxi side span adopt support frame casting in situ construction method, which was concrete π type girder. The paper focus on the characteristics of the asymmetrical structure forma and asymmetric construction method of Hong-shui river especially big bridge, discussing the key contents of construction monitoring, which can offer reference and consulting for related engineering.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here