z-logo
open-access-imgOpen Access
The Comparison of Condition Evaluation of Siak II Steel Frame Bridge between the FCM Method and the Bridge Management System
Author(s) -
Widya Apriani,
Shanti Wahyuni Megasari
Publication year - 2020
Publication title -
iop conference series. earth and environmental science
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.179
H-Index - 26
eISSN - 1755-1307
pISSN - 1755-1315
DOI - 10.1088/1755-1315/469/1/012049
Subject(s) - bridge (graph theory) , computer science , process (computing) , management system , displacement (psychology) , visual inspection , frame (networking) , rigid frame , construction engineering , structural engineering , engineering , artificial intelligence , operations management , medicine , psychology , telecommunications , psychotherapist , operating system
An accurate bridge condition evaluation system is the main factor of a bridge maintenance management. The Government of Indonesia has a bridge evaluation guide based on Australian rules namely the Bridge Management System. In this method, a visual field check is performed to determine the value of the bridge condition and then analyzed by using the bridge management information system program (sim-ibms) through a technical screening process. By using this method, it can be determined several actions are needed to be reported that the bridge is safe or damaged. But this method has been used for 25 years by Indonesia. Nowadays, research and methods are developed to evaluate the condition of bridges, such as the Fracture Critical Member (FCM) method. This method can directly measure displacement through computer programs based on the traffic volume. The evaluation conducted in two ways such are numerical methods with computer programs and visual bridge surveys. Numerical analysis is performed to estimate the critical elements of the bridge which will then evaluated visually. This research aims to compare the condition evaluation of steel frame bridge of Siak II regarding the level of damage and bridge repairing period to obtain appropriate maintenance.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here