z-logo
open-access-imgOpen Access
A Joint Verification System for the Secondary Equipment Safety Measures in Smart Substation
Author(s) -
Zhen’an Du,
Hengxuan Li,
Yongjun Xia,
Zuowei Wang,
Meizi Hong,
Linyao Gao,
Wengang Hu,
Kanjun Zhang,
Ke Chen
Publication year - 2020
Publication title -
iop conference series. earth and environmental science
Language(s) - English
Resource type - Journals
eISSN - 1755-1307
pISSN - 1755-1315
DOI - 10.1088/1755-1315/440/3/032033
Subject(s) - correctness , ticket , measure (data warehouse) , process (computing) , joint (building) , computer science , visualization , reliability engineering , secondary development , engineering , computer security , database , software , architectural engineering , programming language , operating system , artificial intelligence
The secondary system of smart substation has high characteristics of network and integration. The secondary circuit and its safety measures are characterized by strong concealment and poor visualization. There is a great safety risk in the implementation of secondary equipment safety measures. In this paper, a joint verification system of secondary equipment safety measures for smart substation is proposed. The joint verification system uses the monitoring system and the third-party safety measure monitoring equipment to jointly arrange defence, carry out the whole process verification of the implementation process of the secondary equipment safety measure ticket, and carry out visual display, effectively ensuring the correctness of the implementation of the secondary equipment safety measure.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here