Organization of demolition works during production buildings reconstruction
Author(s) -
Pavel Oleinik,
Nadezhda Cherednichenko
Publication year - 2019
Publication title -
iop conference series. earth and environmental science
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.179
H-Index - 26
eISSN - 1755-1307
pISSN - 1755-1315
DOI - 10.1088/1755-1315/403/1/012189
Subject(s) - demolition , production (economics) , construction engineering , architectural engineering , work (physics) , engineering , computer science , civil engineering , mechanical engineering , economics , macroeconomics
The features of the development of projects for the production of works for the dismantling of production buildings of industrial enterprises are considered. The main methods of demolition work depending on the physical condition of the structures and their connecting nodes and the sequence of their implementation for the enterprise and for individual installation zones are given. The procedure for teardown of braced and constrained constructions, as well as the processes of dismantling individual blocks, is disclosed. Decisions on the choice of methods for disconnecting structures and their elements are indicated. A detailed composition of the project for the dismantling of industrial buildings is presented. Measures for ensuring the spatial stability of structures, for the use of technological equipment and removable lifting devices are given.