z-logo
open-access-imgOpen Access
Improving the reliability and efficiency of tillage machines
Author(s) -
A. Lebedev,
P Lebedev,
Anton Zakharin,
N. Maryin,
Yuriy I. Zhevora
Publication year - 2019
Publication title -
iop conference series. earth and environmental science
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.179
H-Index - 26
eISSN - 1755-1307
pISSN - 1755-1315
DOI - 10.1088/1755-1315/403/1/012059
Subject(s) - plunger , materials science , fuel efficiency , automotive engineering , mechanical engineering , reliability (semiconductor) , hardening (computing) , composite material , engineering , power (physics) , physics , quantum mechanics , layer (electronics)
Increasing the efficiency of diesel equipment operation is primarily associated not only with increasing the reliability of its main components, assemblies, joints and details, but also with reducing costs and fuel consumption during production processes. At the same time, operating experience shows that a significant share of the operating time of the equipment is not fully loaded, often up to 40 … 50%. The transient and unsteady modes that arise in this case, as well as the design features of the fuel equipment of domestic diesel engines, lead to an excessive consumption of fuel and a significant increase in the unevenness of fuel supply through the engine cylinders up to 26 … 38%. To ensure a minimum clearance in the plunger pair, it is proposed to apply a diamond-like thin film coating based on silicon oxycarbide onto the working surfaces of the details, which has high microhardness, low friction coefficient, and prevents the setting of contact surfaces by final plasma hardening. After applying the technological operation of hardening the working surfaces of the details by forming a thin film coating, the distribution of the parts over the time of crimping changed so that 82% of the experimental plunger pairs have a hydraulic density exceeding t = 45.7s with an average value of 46.7s with a mean square deviation σ = 1.05s. The results obtained during the tests showed that at the nominal speed of rotation of the cam shaft, the cyclic feed of the produced plunger pairs decreased by 2.8%, while in the experimental ones, the decrease in fuel supply was 1.3%, the uneven fuel supply in both cases did not exceed 2%. The predicted resource of the experimental plunger pairs will be 9000 hours, which is 2.25 times longer the resource of serial plunger pairs.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here